Landis+Gyr Blog

    Integrating Photovoltaic plants – the European challenge

    Integrating renewable energy into the low-voltage (LV) grid is a topic that we have discussed with over 40 DSOs in Europe and came to the understanding that a huge portion of new connection requests, especially for PV plants, are being rejected or significantly delayed.

    The challenge of connecting PV plants to the low-voltage grid is widespread among European DSOs (distribution system operators) and is causing significant concerns within the industry. To shed light on this problem, let us delve deeper into the various facets of this issue and explore potential solutions to address it.

    Read Article  

    5 steps towards a smarter metering infrastructure

    Whether it is a first-time installation, a second wave implementation, or a transformational upgrade, building an Advanced Metering Infrastructure (AMI) is a journey. What steps do you go through once you've committed to taking your AMI to the next level?

    Read Article  

    Supporting African utilities with Revenue enhancement as a service

    Revenue collection and protection is an important aspect that creates challenges for the utility sector in Africa that directly impacts growth and sustainability. These challenges include revenue loss, inadequate infrastructure, and inefficient billing and collection systems. However, in recent years, Revenue Enhancement as a Service has emerged as a powerful solution to help utilities in the African market overcome these hurdles. Explore the advantages of Revenue Enhancement as a Service and how we can support utilities through our service offering.

    Read Article  

    GridFlex Control: Taking control of the active grid

    In an increasingly decentralized grid, grid operators face increasing challenges in grid resilience, asset management, grid balancing, safety, and security. The ability to effectively monitor and control the grid and its assets is vital in identifying issues and taking preventive and corrective actions before grid stability and reliability affected. Thankfully, the digitalization of the energy system through the rollout of smart metering and control equipment opens the door for maneuvering in the next phase of the energy transition.

    Read Article  

    40 years of pioneering in Ultrasonic metering

    In the 1970s, it became urgent for companies to improve flow monitoring as Europe and the rest of the world were suffering from the explosion in oil and energy prices. Sensing the urgency for accurate energy measurement, Landis+Gyr introduced their very first ultrasonic meters 2WR2 which could be directly used for billing. Due to their accuracy, durability, low maintenance and robustness, these meters became the future of heat and cooling measurement. Today they are the foundation of our smart heat and water meters.

    Read Article  

    Half hourly metering and grid management symposium: Key takeaways

    With the electrification of transportation and heating sectors, explosion of EV charging and a general rise in energy demand and prices, the UK energy network is stressed in numerous ways as we drive towards net zero targets. That is why we organized a symposium on Half hourly metering and Grid Management at our UK office in Manchester. 

    Bringing together industry colleagues and stakeholders from across the UK made for great discussions around the issues and challenges in grid management - from billing through to power quality management. With the shift from fossil-based to zero-carbon energy sources, grid operators are coming across completely new challenges - and our collective effort is needed in addressing these challenges, not just at the local metering level but all the way through the network. 

    Read Article  

    Posts by Topic

    See all