Integrating renewable energy into the low-voltage (LV) grid is a topic that we have discussed with over 40 DSOs in Europe and came to the understanding that a huge portion of new connection requests, especially for PV plants, are being rejected or significantly delayed.
The challenge of connecting PV plants to the low-voltage grid is widespread among European DSOs (distribution system operators) and is causing significant concerns within the industry. To shed light on this problem, let us delve deeper into the various facets of this issue and explore potential solutions to address it.